Tennessee Builders Alliance Contracting Opportunities for the New Nissan Stadium Project

Latest Proposal Releases

*Dates listed indicate starting date of solicitation, not due date.

GMP Preparation & Procurement #5 - Bidding has Closed. Bids were due July 10, 2024

  • Trade Package 04.20 - Masonry

  • Trade Package 05.00 - Misc. Steel

  • Trade Package 05.30 - Steel Stairs, Steel Rails, Catwalks, and Gratings

  • Trade Package 05.52 - Handrails and Guardrails

  • Trade Package 06.22.A - Casework Package A: Home Lockers

  • Trade Package 06.22.A - Casework Package B: Suites

  • Trade Package 06.22.A - Casework Package C: Casework (all other)

  • Trade Package 07.10 - Waterproofing, Expansion Joints, and Caulking

  • Trade Package 07.42 - Roofing

  • Trade Package 08.10 - Doors, Frames, and Hardware

  • Trade Package 09.20A - Exterior Drywall Package

  • Trade Package 09.20B - Interior Drywall Package

  • Trade Package 11.13 - Loading Dock Equipment

  • Trade Package 11.40 - Food Service Equipment

  • Trade Package 14.91 - Trash Chute

  • Trade Package 27.20A - Tel/Data/Fiber/Security and CCTV

  • Trade Package 27.20B - AV/Broadcast

  • Trade Package 27.20C - Low Voltage Pathways

  • Trade Package 32.40 - Hardscaping and Site Concrete

  • Trade Package 32.50 - Site; Fences, Bollards, Screening, and Gates

How to use the Potential Bidders Lists: if you are a subcontractor, use this list to reach out to prime bidders to discuss working together on a specified scope of work.

If you are a pre-qualified prime contractor and believe you should be on the Potential Bidders List, please reach out to info@tnbuildersalliance.com. Note: you must be pre-qualified to be on this list.

  • Trade Package 01.74C - Final Clean - Exteriors/Facades

  • Trade Package 07.84 - Fireproofing and Spray Applied Insulation

  • Trade Package 08.33 - Overhead and Coiling Doors

  • Trade Package 08.40 - Interior Glass and Glazing

  • Trade Package 09.30 - Ceramic Tile - Furnish and Install

  • Trade Package 09.50 - Acoustical & Manufactured Ceilings

  • Trade Package 09.60 - Carpet, Wood, and Resilient Floors

  • Trade Package 09.65 - Sealed Concrete Flooring

  • Trade Package 09.67 - Epoxy and Resinous Flooring

  • Trade Package 09.90 - Painting, FRP, HP Coatings, and Wallcoverings

  • Trade Package 10.00B - Miscellaneous Spec. - Lockers, TP,
    and Access/FE/Cabinets/Cubicle Curtains

  • Trade Package 10.65 - Operable Partitions

  • Trade Package 12.20 - Window Treatments

  • Trade Package 32.90 - Landscaping and Irrigation

  • Trade Package 01.74A - Final Clean - Interiors

  • Trade Package 07.80 - Smoke Curtains

  • Trade Package 21.00 - FARS

  • 10.00A - Photoluminescent Egress Markings

  • 03.30C - Loading Dock Concrete Pavement

*By completing this form, I agree that all information provided on this form may be used by the Tennessee Titans, Tennessee Builders Alliance, Nissan Stadium, and CAA ICON to communicate with me at the address, email address and telephone number I provided above. I agree to provide my general electronic consent and understand that my consent to receive communications in this way is used solely for the purpose of the Titans Stadium Project proposal request process.  I understand that I may withdraw my consent to having my information used by sending an email to privacy@tnbuildersalliance.com.

Prequalification for New Nissan Stadium Project

*Please note that the Tennessee Builders Alliance prequalification process is managed through Turner Construction Company’s prequalification platform.

**All 2nd Tier subcontractors and suppliers are not required to submit prequalification information.

  • Prequalification requirements include: strong safety record; financial capabilities; bonding capacity (including committed bonding); current and committed workload; aparticiny past or current citations; violations and/or other proposal restrictions or other criteria deemed appropriate/relevant based on the proposal package scope.

  • All businesses interested in submitting as a Prime/Tier-1 subcontractor must prequalify to receive a Request for Proposal (RFP). For a step-by-step overview of the prequalification process, please reference the Prequalification Navigation Guide.

  • For questions regarding the prequalification process, please email info@tnbuildersalliance.com

  • IMPORTANT: The Subcontractor Prequalification System may work best using the Microsoft Edge browser.

Tennessee Builders Alliance encourages Tennessee certified minority-, women-, small-, and local subcontractors and suppliers to participate in this project. All prospective bidders, subcontractors, vendors, suppliers and other potential bid opportunity participants will be afforded equal opportunities to compete for work without discrimination on the basis of their race, ethnicity, or gender.

As a partnership of local companies, Tennessee Builders Alliance is committed to creating opportunities for all businesses in Middle Tennessee, including certified minority-, women-, and small businesses.  Through a strategic procurement plan and dedicated diverse business engagement, TBA aims for 25 percent overall participation for diverse business enterprises (DBE).

Individual packages have target DBE percentages that vary based on market data. The overall goal is for 25 percent DBE participation across the entire project. Click the button below to access our resource center if you need assistance becoming registered as a DBE.